Customization: | Available |
---|---|
After-sales Service: | Installation Guidance |
Warranty: | 5-10 Years |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
HDPE geomembrane uses high quality polyethylene raw resin, the main component is high density polyethylene, plus carbon black, anti-aging, antioxidant and UV-resistance component; all products are based on American GRI standards and ASTM test standards. The thickness of the smooth and textured surface is 0.2mm-3.0mm, and the width is 1m-12m. It meets the requirements of solid waste containment (such as landfill liners), mining and water containment applications.
1. The width and thickness are complete.
2. It has excellent resistance to environmental stress cracking and excellent chemical corrosion resistance.
3. Excellent chemical corrosion resistance.
4. It has a large operating temperature range and a long service life.
5. Used in landfills, tailings storage sites, channel seepage prevention, dam seepage prevention and subway projects, etc.
Item | Unit | Standard | 0.5mm | 0.75mm | 1.0mm | 1.5mm | 2.0mm | |
Density | G/CM3 | D1505 | 0.94 | 0.94 | 0.94 | 0.94 | 0.94 | |
Tensile Yield Strength | Kn/m | D6693 | 9 | 11 | 15 | 22 | 29 | |
Tensile break Strength | kn/m | D6693 | 15 | 20 | 27 | 40 | 53 | |
Tensile Break Elongation | % | D6693 | 700 | 700 | 700 | 700 | 700 | |
Tear Resistance | N | D1004 | 60 | 93 | 125 | 187 | 249 | |
Puncture Resistance | N | D4833 | 120 | 240 | 320 | 480 | 640 | |
Stress Crack Resistance | hr | D5397 | 500 | 500 | 500 | 500 | 500 | |
Dimensional Stability | % | ±2 | ||||||
Oven Aging at 85ºCafter 90 days Standard OIT -% High Pressure OIT-% |
% | D5721 D3895 D5885 |
55 80 |
|||||
Oxidative Induction time Standard OIT High Pressure OIT |
min | D3895 D4885 |
100 400 |
|||||
UV Resistance High Pressure OIT -% Retained After 1600 hrs |
% | D5885 | 50 |
Construction method
1. The slope should be laid in order from top to bottom. Don't pull too hard.
2. The adjacent longitudinal seams should not be on the horizontal line and should be staggered by more than 1m.
3. The longitudinal seam should be more than 1.50m away from the dam foot and the bent foot, and should be located on the plane.
4. When laying the slope, the film laying direction should be basically parallel to the slope line.
5. During construction, first use small-diameter sand or clay to level the base layer, and then lay geomembrane. The geomembrane should not be pulled too tightly, and the buried soil at both ends is corrugated. A transition layer of about 10cm is laid with sand or clay on the geomembrane.
The product is suitable for
1. Such as landfill, sewage treatment plant, power plant regulating tank, industrial and hospital solid waste, etc;
2. LDPE anti-seepage membrane is applicable to water conservancy projects: such as anti-seepage, plugging, reinforcement of rivers, lakes, reservoirs and dams, anti-seepage of canals, vertical core walls, slope protection, etc;
3. HDPE anti-seepage membrane in Municipal Engineering: subway, underground engineering of buildings, planting roof, roof garden and sewage pipe anti-seepage;
4. Polyethylene anti-seepage membrane is applicable to gardens: artificial lakes, rivers, reservoirs, pond bottoms of golf courses, slope protection, waterproof and moisture-proof of green lawns, etc;
5. HDPE geomembrane is applicable to petrochemical: chemical plant, refinery, anti-seepage of oil storage tank, lining and secondary lining of chemical reaction tank and sedimentation tank;
Anhui Zhonglu Engineer Material Co., Ltd is the leading geomembrane manufacturer, wholesaler, supplier and exporter dedicated in supplying one stop geomembrane products and solutions to worldwide customers since its foundation in 2008. We have over 200 professional staffs and 30,000 square meters manufacturing factory equipped with state of the art production lines and testing equipment.Product innovation, quality assurance and customer satisfaction are our long term commitment to our partners. Our main innovative,high quality geomembranes include Smooth Geomembrane HDPE Liner, Textured HDPE Geomembrane, Composite Geomembrane Liner, HDPE liner, pond liner, geotextile membranes and other geosynthetic products such as geotextile, geocell, geosynthetic clay Liner,geogrid and drainage board, etc al. All products had been certificated by the ISO9001, ISO14001, Soncap, SASO and BV certificates and passed the test of SGS and Intertek etc. Our professional geommebrane factory is equipped with advanced processing machines and production lines, which give us the power to keep high product quality, shorter delivery time and competitive cost to meet the demands of our worldwide customers. Most of our products had been kept up with the international forefront counterparts, some of them have enjoyed leading position, especially smooth HPDE geomembranes. We also can manufacture according to your special requirements, ODM, OEM, customization are also available.
1.Are you manufacturer or trade company?
We Zhonglu are a professional geosynthetic products manufacture, we will provide you with top-class service.
2. What's the order process?
a.Inquiry--- The more detailed information you provide, the more accurate product we could provide you.
b. Quotation---Resonable quotation with clear specifications.
c. Sample confirmation---Sample could be sent before the final ordering.
d. T/T 30% in advanced, and the balance could be paid before shipment.
e. Production---Mass production.
f. Shipping--- By sea, air or courier. Detailed picture of package could be provided.
3. How long is your delivery time?
Generally it is 3-5 days if the goods are in stock. or it is 5-7 days if the goods are not in stock, it is according to quantity.
4. How does your factory do regarding quality control?
"Quality is priority." We always attach great importance to quality controlling from the beginning to the end.
5.What's the payment method you accept?
T/T, L/C,D/P etc.