Nonwoven geotextile fabric tear-Resistant geotube with low price Factory sales geotextile
Product Parameters
Item |
Unit |
Technical Parameters |
Tube 500 |
Tube 750 |
Tube 1000 |
Breaking strength |
MD |
KN/m >= |
70 |
120 |
200 |
CD |
KN/m >= |
90 |
120 |
200 |
Elongation of break |
MD |
%<= |
20 |
20 |
20 |
CD |
%<= |
10 |
10 |
10 |
Sewing Tensile strength |
>=% |
80 |
80 |
80 |
Bursting Strength(CBR) |
KN>= |
8 |
14 |
18 |
Equivalent opening size(O90) |
mm |
0.2-0.6 |
0.2-0.6 |
0.2-0.6 |
Permeability(Q50) |
L/m2/s>= |
20 |
13 |
15 |
UV-resistance(500HRS strength retention) |
%>= |
90 |
80 |
80 |
Product Description
Production:
1.Geotextile Tube is manufactured from woven high tenacity polypropylene multifilament yarns, which are woven into a stable network such that the yarns retain their relative position.
2.It is inert to biological degradation and resistant to naturally encountered chemicals, alkalis and acids, etc.
3.Geotextile tube has different strength and permeability, and have high UV resistance, seawater resistance, microbial erosion resistance and other durability.
Feature:
1. High strength, low deformation
2. Durability: steady property, not easy to resolved, air slaked and can keep the original property long term
3. Anti-erosion: anti-acid, anti-alkali, resists insects and mould
4. Permeability: could control the sieve size to retain certain permeability
5.Effective high volume containment
6.Efficient dewatering and volume reduction
7.Cost effective
8.No special equipment required
Detailed Photos
This knowledge technology have a three-step process:
Step 1: Filling -- Sludge (dredged material) is pumped into the Geotube container. Environmentally-safe polymers are added to the sludge, which makes the solids bind together and water separate. The TenCate Geotube?container's unique fabric confines the fine grains of the material.
Step 2: Dewatering -- Clear effluent water simply drains from the Geotube container through the small pores in the specially engineered textile. This results in effective dewatering and efficient volume reduction of the contained materials. And this volume reduction allows for the repeated filling of the Geotube container. Over 99% of solids are captured, and clear filtrate can be collected and recirculated through the system. The decanted water is often of a quality that can be reused/returned for processing or returned to native waterways without additional treatment.
Step 3: Consolidation -- After the final cycle of filling and dewatering, the solids remain in the bag and continue to densify due to desiccation as residual water vapor escapes through the fabric. Volume reduction can be as high as 90 percent. When full, the Geotube container and contents can be deposited at a landfill, remain on-site, or the solids can be removed and land-applied when appropriate.
Packaging & Shipping
FAQ
Q: Can you send samples?
A: Yes, we are very happy to provide you with free samples to check the quality of our products.
Q: Are you a manufacturer or a trading company?
A: Our company located in Hefei, Anhui Province, with are registered capital of 52 million yuan. It is a professional manufacturer of geocell, geomembrane, nonwoven geotextile, woven geotextile, geogrid and other products. So we have the competitive price with best quality.
Q: Can you produce the product according to customers' requirements?
A: Sure, we are professional manufacturer, OEM and ODM are both welcome.
Q: How long is the delivery time?
A: General within 3-7 days after receiving the deposit.
Q: How to control product quality?
A: Our factory adopts lean management, products from the beginning to the end of the production process have strict quality control. All products must be strictly tested before packing and shipping.
Our Projects
Application
1. Bank protection
2. Dyke protection
3. Base protection
4. Embankment engineering
5. Dam engineering
6. Cofferdam engineering
Certifications
After Sales Service
Quality assurance
1.On a regular basis or as per your request,we entrust national testing agencies to conduct quality inspections
2.Strictly in accordance with the ISO9001-2008 international quality system standard,we monitor and manage the whole process throughout production,quality testing,and measurement to ensure product quality
3. For quality-related construction delay or substandard construction(except for damage or losses due to customer's responsibility or irresistible natural disasters),we have refunding,replacement,and repair services.We will respond to customers' feedbacks on quality issues within 24 hours.
After-sales service
1.In order to provide customers with comprehensive technical support,we will provide technical and other related information upon request in a timely manner.
2.In required,we will appoint specialized technicians to the construction site to give technical trainings to construction people,and offer technical guidance throughout the whole construction process.
3.For damage due to shipment and delivery,after we receive the complaint,we will check the issure through provided pictures and videos.If our responsibility is confirmed,we wil offer free replacement.
4.When the construction is completed,as your request,our technical staff may participate in the final acceptance.