Customization: | Available |
---|---|
Certification: | CE, ISO |
Surface: | Smooth |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
HDPE Geomembrane Technical Parameter (GB standard)
|
|||||||
Spec Properties |
GMS0.5
|
GMS0.75
|
GMS1.0
|
GMS1.25
|
GMS1.5
|
GMS2.0
|
GMS2.5
|
Thickness
|
0.5mm
|
0.75mm
|
1.0mm
|
1.25mm
|
1.5mm
|
2.0mm
|
2.5mm
|
Tensile Properties (each direction) (≥) .yield strength .break strength .yield elongation .break elongation |
7KN/m 10KN/m -- 600% |
10KN/m 15KN/m -- 600% |
13KN/m 20KN/m 11% 600% |
16KN/m 25KN/m 11% 600% |
20KN/m 30KN/m 11% 600% |
26KN/m 40KN/m 11% 600% |
33KN/m 50KN/m 11% 600% |
Density(≥)
|
0.940g/cc
|
0.940g/cc
|
0.940g/cc
|
0.940g/cc
|
0.940g/cc
|
0.940g/cc
|
0.940g/cc
|
Puncture Restistance (≥)
|
120N
|
180N
|
240N
|
300N
|
360N
|
480N
|
600N
|
Carbon Black Content
|
2.0-3.0%
|
2.0-3.0%
|
2.0-3.0%
|
2.0-3.0%
|
2.0-3.0%
|
2.0-3.0%
|
2.0-3.0%
|
Carbon black Dispersion
|
Noted(1)
|
Noted(1)
|
Noted(1)
|
Noted(1)
|
Noted(1)
|
Noted(1)
|
Noted(1)
|
Tear Resistance (≥)
|
56N
|
84N
|
115N
|
140N
|
170N
|
2255N
|
280N
|
Oxidative Induction Time(OIT) Standare OIT(≥) |
60min. |
60min. |
60min. |
60min. |
60min. |
60min. |
60min.
|
FAQ
1.Are you manufacturer or trade company?
We Zhonglu are a professional geosynthetic products manufacture, we will provide you with top-class service.
2. What's the order process?
a.Inquiry--- The more detailed information you provide, the more accurate product we could provide you.
b. Quotation---Resonable quotation with clear specifications.
c. Sample confirmation---Sample could be sent before the final ordering.
d. T/T 30% in advanced, and the balance could be paid before shipment.
e. Production---Mass production.
f. Shipping--- By sea, air or courier. Detailed picture of package could be provided.
3. How long is your delivery time?
Generally it is 3-5 days if the goods are in stock. or it is 5-7 days if the goods are not in stock, it is according to quantity.
4. How does your factory do regarding quality control?
"Quality is priority." We always attach great importance to quality controlling from the beginning to the end.
5.What's the payment method you accept?
T/T, L/C,D/P etc.